[1]
Patchineelam, S.M. 2021. Riverine Women after Resettlement: The Case of the Belo Monte Hydropower Dam Project. SPOOL. 8, 3 (Dec. 2021), 43–56. DOI:https://doi.org/10.7480/spool.2021.3.6219.