Aslaminezhad, Atousa, Arwin Hidding, Henriette Bier, and Giuseppe Calabrese. 2024. “In-Situ Vs. Prefab 3D Printing Considerations for CO2-Free Pop-up Architecture”. SPOOL 11 (1): 71-80. https://doi.org/10.47982/spool.2024.1.05.